
Larsen Park Construction
Men work on grading of Carl Larsen Park at Vicente near 19th Avenue.
SunsetContains 12978 photos
Men work on grading of Carl Larsen Park at Vicente near 19th Avenue.
Sunset[Waterfall @ Quarry Feb 1930 P37] Men working on construction of Rainbow Falls in an old quarry below Prayerbook Cross in Golden Gate Park
Golden Gate Park[Feb 1930 Waterfall G.G. Park P ] Men working on construction of Rainbow Falls in an old quarry below Prayerbook Cross in Golden Gate Park
Golden Gate ParkMen grading Crossover Drive during WPA construction.
Golden Gate ParkConstruction work on Crossover Drive at Fulton Street. View looking north toward Park Presidio Blvd. Houses on 14th Ave at left. This is the current site of the Rose Garden (Rose Garden installed 1960-61)
Golden Gate ParkMen working on WPA construction of Crossover Drive, Golden Gate Park
Golden Gate ParkMen paving Crossover Drive in Golden Gate Park during WPA construction.
Golden Gate ParkMen paving Crossover Drive in Golden Gate Park during WPA construction.
Golden Gate ParkOiled subgrade during WPA construction of Crossover Drive in Golden Gate Park; looking north towards 25th and Fulton Street entrance
Golden Gate ParkWPA construction of Crossover Drive / 25th Ave in Golden Gate Park
Golden Gate ParkLaying infrastructure for WPA construction of Crossover Drive / 25th Ave in Golden Gate Park
Golden Gate ParkWPA construction of Crossover Drive / 25th Ave in Golden Gate Park
Golden Gate ParkCrossover Drive through Golden Gate Park under construction
Golden Gate ParkUnidentified men (possibly the architects or engineers), pose in front of the ongoing WPA construction of Crossover Drive in Golden Gate Park.
Golden Gate ParkWPA construction of Crossover Drive in Golden Gate Park, looking northwest towards 25th Ave exit.
Golden Gate Park