wnp70.0720
Bay Bridge
January 1, 1936
[San Francisco-Oakland Bay Bridge. Measuring 8 1/4 miles in length, this double-decked bridge will carry 6 lanes of Auto traffic on the upper level and 3 lanes of Trucks plus 2 Electric Railway lines on the lower level. Maximum ship clearance 218ft. Cost $77,600,000. Expected date of completion Nov 1st, 1936.]

Keywords
Artifact
- Date Added: October 21, 2019
- Contributor: Courtesy of Molly Blaisdell
Rights
Downloadable: Yes