wnp70.0720

Bay Bridge

January 1, 1936

[San Francisco-Oakland Bay Bridge. Measuring 8 1/4 miles in length, this double-decked bridge will carry 6 lanes of Auto traffic on the upper level and 3 lanes of Trucks plus 2 Electric Railway lines on the lower level. Maximum ship clearance 218ft. Cost $77,600,000. Expected date of completion Nov 1st, 1936.]

Bay Bridge
Location

429 Beale St, 94105

Keywords
Artifact
  • Date Added: October 21, 2019
  • Contributor: Courtesy of Molly Blaisdell
Rights

Downloadable: Yes